Long Beach

Client: Owners Corporation and Superintendent
Project Value: $1,900,000
Project Duration: 8 Months

Hitech Remedial was engaged to carry out both structural and waterproofing repairs to 11 townhouses within close proximity to the sea. The extent of the damage included the replacement of excessively rusted lintels, waterproofing of the existing bondek slab systems and fa├žade coating to ensure the longevity of the complex.

This repair has restored the structural integrity and weather proofing of the units in the complex and once again has offered a cost effective and a permanent solution without the excessive costs of rebuilding.

 